Once you click “Start Test” below, you must finish the entire test in one sitting. You cannot leave the test and come back later.
You have one attempt at the test.
The test will be one (1) hour, thirty (30) minutes long.
Make sure you have a stable internet connection.
In order to pass you will need to achieve a mark of 75% or more.
If you experience any problems with writing the test please contact support@pirb.co.za for assistance.
Good Luck!
Quiz Summary
0 of 40 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 40 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 40
1. Question
A solar water heating system installed in the southern-hemisphere, the collectors must face ……………?
-
Question 2 of 40
2. Question
SANS 10106:2014, section 5.2, refers to:
-
Question 3 of 40
3. Question
A PIRB certificate of compliance must always be issued when a solar water heating system is installed.
-
Question 4 of 40
4. Question
In terms of signing off a solar installation certificate of compliance, who can carry out this function?
-
Question 5 of 40
5. Question
Is SANS 10252-1 for:
-
Question 6 of 40
6. Question
Is SANS 10254 for:
-
Question 7 of 40
7. Question
What is the maximum allowable flow velocity for a below ground domestic water pipe?
-
Question 8 of 40
8. Question
Stratification is when:
-
Question 9 of 40
9. Question
When a situation on-site does not allow for the standards to be complied with, should you have:
-
Question 10 of 40
10. Question
When installing a pump, should you ensure:
-
Question 11 of 40
11. Question
SANS 10106:2014, Section 5.3.5 makes specific reference to:
-
Question 12 of 40
12. Question
Which factor plays a role in an underperforming system?
-
Question 13 of 40
13. Question
Name a factor that could result in insufficient savings:
-
Question 14 of 40
14. Question
Why does pipe friction matter in the primary loop?
-
Question 15 of 40
15. Question
Which section of SANS 10106:2014 refers specifically to access of components?
-
Question 16 of 40
16. Question
Select the most appropriate in terms of the POSITIVES of using solar energy
-
Question 17 of 40
17. Question
What are the advantages of employing a direct system if appropriate?
-
Question 18 of 40
18. Question
The following drawing denotes a pump solar system. Where would one place the pump on the system?
-
Question 19 of 40
19. Question
Looking at the picture, what is the minimum distance required between the top of the collector and the bottom of the solar cylinder (A)?
-
Question 20 of 40
20. Question
What solar configuration is depicted in the picture?
-
Question 21 of 40
21. Question
The following drawing denotes a pump solar system. Identify which would be the hot water return from the collectors?
-
Question 22 of 40
22. Question
What solar configuration is depicted in the picture?
-
Question 23 of 40
23. Question
What valve is shown in the picture?
-
Question 24 of 40
24. Question
What valve is shown in the picture?
-
Question 25 of 40
25. Question
What valve is shown in the picture?
-
Question 26 of 40
26. Question
What valve is shown in the picture?
-
Question 27 of 40
27. Question
As a licensed plumber you can issue a plumbing certificate of compliance for any plumbing works, irrespective if you; have not inspected, or done the work?
-
Question 28 of 40
28. Question
Select which of these statements are correct?
-
Question 29 of 40
29. Question
Pipework connected to the hot water cylinder must be insulated ……………………
from the cylinder -
Question 30 of 40
30. Question
Temperature/ pressure valve is set to open once water reaches …………………….?
-
Question 31 of 40
31. Question
Is the following statement correct: All valves used in the system can have a different pressure rating?
-
Question 32 of 40
32. Question
A hot water storage vessel must be manufactured in terms of SANS ……?
-
Question 33 of 40
33. Question
In terms of SANS 10252-1 no flow control device shall be installed between …………………….
-
Question 34 of 40
34. Question
Is the following statement correct: A 400KPA rated geyser may be installed with out the use of a pressure control device if a storage tank is used that provides a contact head of pressure that does not exceed a static pressure of 800KPA?
-
Question 35 of 40
35. Question
SANS 10254; 5.4 makes reference to
-
Question 36 of 40
36. Question
To save costs on the plumbing installation the following discharge pipes may be joined together:
-
Question 37 of 40
37. Question
True or False: Only metallic pipe may used as a discharge pipe for the expansion control valve?
-
Question 38 of 40
38. Question
True or False: Use of non certified type components and fittings is allowed in the assembly of a hot water heating system?
-
Question 39 of 40
39. Question
True or False: 10254 covers water heaters that fall within the scope of SANS 151?
-
Question 40 of 40
40. Question
True or False: Drip trays are required for an over basin installation?